A timber frame extension typically costs from around £1,400 to £2,400 per square metre for the frame-based build, with finished extensions commonly quoted from about £1,800 per m². Oak, the premium option, starts at around £2,400 per m². Timber frame is usually quicker to build than masonry because much of the structure is made off site.
Cost per square metre
| Build type | Typical cost per m² |
|---|---|
| Timber frame (softwood) | £1,400–£2,400 |
| Finished timber frame extension | From around £1,800 |
| Oak frame | From around £2,400; often £2,400–£3,000 including groundworks and fittings |

Costs vary with design, glazing, finishes and location. Groundworks, landscaping and fit-out are often priced separately, so check what each quote includes.
Why choose timber frame
- Speed. Panels made off site go up in days, so the extension is weathertight sooner.
- Weight. Lighter than blockwork, which matters when building over a garage or adding a storey to a bungalow.
- Insulation. Timber frame walls take insulation within the frame depth, helping thermal performance.
- Fewer labour hours on site, which is why it's often a little cheaper than masonry.

The trade-offs
- Design must be fixed early, because the frame is manufactured to the drawings.
- Lead times for the frame can be several weeks.
- External finish: you'll still clad it, in brick, render or timber, to suit the house.
- Mortgage and warranty: timber frame is mainstream, but confirm your lender and warranty provider are happy with the system used.

Planning and regs
Construction method doesn't change planning rules. Timber frame extensions follow the same permitted development and planning permission limits as any other. See extension size limits. Building regulations approval is still required.
FAQs
How much does a timber frame extension cost per m²?
Typically £1,400–£2,400 per m², with finished extensions commonly from about £1,800 per m².
Is timber frame cheaper than brick?
Often slightly, because there are fewer labour hours on site, though the finish you choose matters more.
How long does a timber frame extension take?
The frame itself goes up quickly; the whole build is usually shorter than masonry once the frame arrives.
Does a timber frame extension need planning permission?
The same rules apply as for any extension.
How much does an oak frame extension cost?
From around £2,400 per m², often £2,400–£3,000 including groundworks and fittings.